Blog
DESPITE TARIFF WAR, PRE-ENGINEERED BUILDINGS REMAIN IN DEMAND
Don’t go by the news that the tariff war might lead to an increased cost of steel, and an increased cost of pre-engineered buildings. At Senate Construction, we continue to see tremendous interest in pre-engineered buildings, and the latest market data is pointing in this direction.
Technavio just reported the global pre-engineered building market is expected to register a compound annual growth of around 8 percent during the period 2018-2022.
A key factor driving the market’s growth is the growing demand for warehouses because of the ongoing boom in the e-commerce and logistics sectors, along with the rising number of e-retailers, according to the same report.
At Senate Construction, we have mastered the art of pre-engineered and three-plate steel construction, and built one of the largest pre-engineered buildings in New England. The four most important things to our clients are efficiency, affordability, reliability and quality, and over and over, we have found ourselves recommending pre-engineered buildings as the best option for projects spanning all industries.
Want to sign up to receive notifications on Senate’s latest blogs and news? Click here
